Identify and rework paint faults on a curtainsider bulkhead
You are a vehicle painter in the paint shop.
What has happened
Curtainsider WO-26-0418 for Statewide Fleet Leasing failed the paint gate with two runs on the front bulkhead, recorded as NCR-26-089. The customer wants the vehicle on 9 October and it is one of three identical units that will be inspected during the customer quality audit. Booth 1 is being serviced because its airflow is dropping, so the rework must be done in booth 2. Last week a painter entered a booth during flash off without a respirator and reported chest tightness, so the supervisor is enforcing booth entry rules strictly. Your respirator fit test is current and the air supplied set is available.
Deliverables
- Booth and respiratory protection plan
- Fault identification and cause analysis
- Rework plan with mixing and film thickness records
- Updated work order and non-conformance record
- Waste record and hazard report
Documents to use
Systems to use
Work Orders and Build Tracker
Tracks every body, trailer and bus build from planned release through fabrication, assembly, fit-out, paint and final inspection to delivery.
Non-Conformance Register
Records every product, material or process non-conformance found at stage gates, in the field or at supplier receival, with disposition and corrective action status.
Safety Incident and Hazard Register
The register of injuries, near misses, hazards, chemical exposures and property damage across the three sites, with investigation status and actions.
Plant Maintenance and Calibration Requests
Logs breakdown, preventive service, calibration and inspection requests for cranes, machines, welding equipment, booths and measuring equipment.
Units of competency
Current on training.gov.au for the Automotive Manufacturing as at 10 September 2026.
AUMGTP001Finish and paint vehicle body and part surfacesAUMGTP002Rework vehicle paint faultsAUMGTY001Paint vehicle chassis and panelsAUMASA011Apply safe work practices in the automotive manufacturing environmentAUMGTM008Bond and repair fibreglass componentsQualifications
AUM30226Certificate III in Automotive Manufacturing Technical Operations - Bus, Truck and TrailerWhat to look for
Evidence guide
The fault must be correctly identified as runs with plausible causes such as excessive film build, low viscosity, gun distance or insufficient flash off. The rework plan must follow the technical data sheet and the procedure, including pot life and flash off. Respiratory protection and booth entry rules must be correct. Records must be complete and the waste handled to the policy.