Fit out a pantech body: door, floor and trim
You are a production worker on the body build and fit-out line.
What has happened
Insulated pantech body WO-26-0415 for Pinnacle Refrigerated Logistics moves onto the fit-out line on Monday. You will be fitting the roller door, the floor panels and the interior trim with the crew. Last week a fitter cut his hand positioning a floor panel by hand, and the manager has ruled that panels must be handled with the panel lifter and cut resistant gloves. The customer's refrigeration unit arrives on 15 September and the build is due on 2 October. Stores has a back order on amber marker lights, and the manager wants to hear about any missing or damaged component before the line stops rather than after.
Deliverables
- Component check list against drawing and stock
- Written fitting method for floor panels and door
- Toolbox talk record on panel handling
- Updated work order notes with shortages reported
Documents to use
Systems to use
Work Orders and Build Tracker
Tracks every body, trailer and bus build from planned release through fabrication, assembly, fit-out, paint and final inspection to delivery.
Materials and Components Stock
Stores register of steel, sheet, fasteners, hydraulic, electrical and paint stock with quantities on hand, reorder points and supplier.
Units of competency
Current on training.gov.au for the Automotive Manufacturing as at 10 September 2026.
AUMGTM001Assemble vehicle componentsAUMGTM004Install and fit out componentsAUMGTT001Apply trim to vehicle componentsAUMGTY002Install vehicle componentsAUMAMA001Contribute to production goalsQualifications
AUM20218Certificate II in Automotive Manufacturing Production - Bus, Truck and TrailerWhat to look for
Evidence guide
Evidence must show components checked against the drawing before fitting, the back ordered marker lights identified and reported early, correct use of the panel lifter and gloves, and a fitting sequence that respects sealant cure times. The toolbox talk must state the hazard, the control and an action. The work order notes must be specific about what is complete and what is outstanding.